Til hovedinnhold
Norli Bokhandel

Modernizing Probable Maximum Precipitation Estimation

2024, Pocket, Engelsk

476,-529,-

På fjernlager - sendes normalt innen 7 til 14 virkedager
  • Gratis frakt på ordre fra 299,-
  • Bytt i 200 butikker
  • Ikke tilgjengelig for hent i butikk
For more than 75 years, high-hazard structures in the U.S., including dams and nuclear power plants, have been engineered to withstand floods resulting from the most unlikely but possible precipitation, termed Probable Maximum Precipitation (PMP). Failure of any one of the more than 16,000 high-hazard dams and 50 nuclear power plants in the United States could result in the loss of life and impose significant economic losses and widespread environmental damage, especially under the pressures of climate change. While PMP estimates have provided useful guidance for designing critical infrastructure, weaknesses in the scientific foundations of PMP, combined with advances in understanding, observing, and modeling extreme storms, call for fundamental changes to the definition of PMP and the methods used to estimate it. Modernizing Probable Maximum Precipitation Estimation recommends a new definition of PMP and presents a vision for a methodology relevant for design, operation, and regulatio

Produktegenskaper

Kundeanmeldelser

Frakt og levering